Switch device and power supply control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9984844
SERIAL NO

15244346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The switch device includes a control switch that turns on/off an electrical connection between an apparatus and the power supply, a condition judging circuit that judges conditions of driving the control switch, an electric wave reception circuit that receives an electric wave, and a power supply circuit that generates power from the electric wave received by the electric wave reception circuit. An electric wave transmission device that transmits an electric wave for making the switch device operate is arranged in a space, whereby the electric wave can be received by the electric wave reception device in the specific space. The switch device controls the control switch to be turned off/on when the electric wave is received. Alternatively, when the electric wave is not received, the switch device turns on/off the control switch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTD398 HASE ATSUGI-SHI KANAGAWA-KEN 243-0036

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukutome, Takahiro Atsugi, JP 71 451

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00