Solar powered water pumping system with photovoltaic system that tracks a maximum power point

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9985439
SERIAL NO

15282394

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and a method provide a photovoltaic system which regenerates the output characteristics of the photovoltaic at different ambient condition with high precision under all environmental conditions. The photovoltaic system includes a photovoltaic array, a buck/boost converter, a DC link capacitor to connect the buck/booster converter to a load/inverter, an adaptive network-based fuzzy inference maximum power point tracking controller, a voltage control loop, a proportional integral controller to maintain the output voltage of the photovoltaic array to the reference voltage by adjusting the duty ratio of buck/boost converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALSP O BOX 5071 INNOVATION AND INDUSTRIAL RELATION INNOVATION CLUSTER BUILDING DTV DHAHRAN 31261

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abido, Mohamed Ali Dhahran, SA 3 64
Khalid, Muhammad Sheraz Dhahran, SA 3 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 29, 2021
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00