Building construction surface element and building construction / building construction surface arrangement and method to manufacture same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9985573
SERIAL NO

15028145

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building construction surface element includes a PV-panel and, spaced therefrom, a building construction element including a mounting plate spaced from and facing the backside of the PV-panel and a thermal insulation plate. Spacers define for an interspace between the backside of PV module and the topside of the mounting plate. Building construction surface elements are used to finish building surfaces. As such building surfaces may possibly not be covered by an integer number of the building construction surface elements, dummy building construction surface elements may be provided which do not have a PV module, but whereon a more easily tailorable PV module fake is applied. By combining building construction surface elements with appropriately tailored dummies the building construction surface may be completely covered, thereby providing for a homogeneous optical appearance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DESIGNERGY SA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lepori, Daniel Castagnola, CH 5 4
Manodoro, Dario Como, IT 7 21
Spinelli, Federico Como, IT 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00