Methods and apparatus related to a flexible data center security architecture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9985911
SERIAL NO

14621892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, edge devices can be configured to be coupled to a multi-stage switch fabric and peripheral processing devices. The edge devices and the multi-stage switch fabric can collectively define a single logical entity. A first edge device from the edge devices can be configured to be coupled to a first peripheral processing device from the peripheral processing devices. The second edge device from the edge devices can be configured to be coupled to a second peripheral processing device from the peripheral processing devices. The first edge device can be configured such that virtual resources including a first virtual resource can be defined at the first peripheral processing device. A network management module coupled to the edge devices and configured to provision the virtual resources such that the first virtual resource can be migrated from the first peripheral processing device to the second peripheral processing device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JUNIPER NETWORKS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aybay, Gunes Los Altos, US 112 3091
Frailong, Jean-Marc Los Altos, US 113 4500
Sindhu, Pradeep Los Altos Hills, US 190 5374
Venkatramani, Anjan Los Altos, US 52 2410
Vohra, Quaizar Santa Clara, US 43 1655

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00