Method and device for control of a sunlight acquisition phase of a spacecraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988162
APP PUB NO 20170183108A1
SERIAL NO

15039018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method to control a sunlight acquisition phase of a spacecraft with a nonzero angular momentum of an axis DH. The spacecraft includes a solar generator configured to rotate about an axis Y. The spacecraft actuators are controlled to place the spacecraft in an intermediate orientation in which the axis Y is substantially orthogonal to the axis DH. The solar generator is controlled to orientate the solar generator towards the sun. The spacecraft actuators are controlled to reduce the angular momentum of the spacecraft. The actuators of the spacecraft engine are controlled to place the spacecraft in an acquisition orientation in which the axis Y is substantially orthogonal to the direction of the sun with respect to the spacecraft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIRBUS DEFENCE AND SPACE SAS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cuilleron, Nicolas Toulouse, FR 2 5
Laurens, Philippe Beauteville, FR 6 23
Sperandei, Jean Toulouse, FR 7 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00