Skid steer loader lift linkage assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988786
SERIAL NO

14627328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lift linkage assembly for a work machine having a work tool. The lift linkage assembly includes a frame, a boom arm, an upper link, a lower link, and a hydraulic actuator. The boom arm is configured to be pivotally coupled to the work tool and has a surface that defines a longitudinal axis. The upper link has a first end pivotally coupled to the frame and a second end pivotally coupled to the boom arm. The lower link has a first end pivotally coupled to the frame and a second end pivotally coupled to the boom arm. The hydraulic actuator has a rod that is pivotally coupled to the boom arm and moves between a retracted position and an extended position. The upper link, lower link, and hydraulic actuator are each spaced from the longitudinal axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ekins, Jeff Mona, US 2 25
Kahler, Andrew W Dubuque, US 12 154
Kumbhar, Nilesh Dubuque, US 14 88
Martin, Kyle T Asbury, US 10 91
Shekleton, Travis Peosta, US 3 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00