Panel construction member and mounting structure thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988820
APP PUB NO 20170175397A1
SERIAL NO

15301788

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a panel construction member and a mounting structure for the same that can be rigidly mounted to a building and for which the panel, after being mounted, has excellent flexural strength and flexural rigidity. A panel construction member 1 has a layered structure in which a core plate 4 is disposed between a pair of metal plates 2, 3, wherein the panel construction member 1 is provided with a groove 5 that extends along at least one pair of edges of the panel construction member 1, and an undercut portion 5a that penetrates between the metal plates 2, 3 from the groove 5. A rail member 6 is mounted in the groove 5 of the panel construction member 1, and the panel construction member 1 is mounted to a ceiling or a wall by means of the rail member 6.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI CHEMICAL CORPORATION1-1 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 100-8251

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Komatsu, Kenjiro Chiyoda-ku, JP 3 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00