Method for manufacturing superior 13Cr friction-welded drillrod

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988857
APP PUB NO 20160076315A1
SERIAL NO

14784446

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for manufacturing a superior 13Cr friction-welded drillrod, the method comprising the following steps: manufacturing a superior 13Cr tube body; manufacturing a superior 13Cr internally threaded coupler and a superior 13Cr externally threaded coupler, respectively; connecting the superior 13Cr internally threaded coupler and the superior 13Cr externally threaded coupler respectively to the two ends of the superior 13Cr tube body by means of frictional butt welding; after heating seam areas to 950° C.-1000° C., cooling same to below 200° C. by ejecting compressed air onto the surfaces of the seam areas, and then cooling the seam areas to room temperature by spraying water; and tempering the seam areas by heating same to 640° C.-700° C. By the present method, a superior 13Cr friction-welded drillrod can be manufactured, which, in the case of the exploration of a gas filed containing a relatively high level of CO2, can be not only used as a drillrod in an earlier stage of nitrogen well-drilling operation, but also used as an oil tube in a later stage of well completion with oil tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAOSHAN IRON & STEEL CO LTDSHANGHAI 201900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dong, Changfu Shanghai, CN 6 1
Yu, Jie Shanghai, CN 218 4360
Zhao, Peng Shanghai, CN 285 2308

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00