Ebullient cooling device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988964
APP PUB NO 20170101919A1
SERIAL NO

15315827

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ebullient cooling device includes: an internal combustion engine cooled by boiling a coolant flowing through a coolant passage formed within the internal combustion engine; a gas-liquid separator that separates a coolant discharged from the internal combustion engine into a liquid-phase coolant and a gas-phase coolant; a condenser that is disposed on a downstream side of the expander, and cools the gas-phase coolant having passed through the expander so as to be changed into a liquid-phase coolant; a first passage that supplies the liquid-phase coolant from the condenser to the coolant passage formed within the internal combustion engine; a second passage that is branched from the first passage, and is connected to the gas-liquid separator; and a control valve that controls a supply state of a liquid-phase coolant supplied to the gas-liquid separator from the condenser through the second passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Masahiro Mishima, JP 437 2916

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00