Method of producing an explosive emulsion composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9989344
SERIAL NO

14900120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing an explosive composition comprising a liquid energetic material and sensitizing voids, the sensitizing voids being present in the liquid energetic material with a non-random distribution, which method comprises: providing a flow of liquid energetic material; and delivering sensitizing voids into the flow of liquid energetic material in a series of pulses to provide regions in the liquid energetic material in which sensitizing voids are sufficiently concentrated to render those regions detonable and regions in the liquid energetic material in which the sensitizing voids are not so concentrated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ORICA INTERNATIONAL PTE LTD70 ANSON ROAD #07-02 HUB SYNERGY POINT SINGAPORE 079905

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, John Ayr, GB 89 1247
Kirby, Ian John Ayr, GB 5 51
Rayson, Mark Stuart Tuggerawong, AU 7 34
Sujansky, Vladimir East Burwood, AU 9 80
Walter, James Cottesloe, AU 17 178
Zank, Johann Valentine, AU 5 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00