Bipolar li-ion battery with improved leaktightness and associated method of production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9991548
SERIAL NO

14775411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a bipolar battery with at least two electrochemical cells stacked one above the other, each collector comprising at its periphery at least one bead of an electrical insulating material also constituting a peripheral zone of the electrolyte-leaktight wall. According to the invention, each leaktight wall is constituted of at least one bead consisting of a honeycomb matrix, the matrix being covered, on each of its two main faces, with a layer or leaf made of heat-sealing and electrically insulating material, each layer or leaf being heat-sealed to one of the current collectors, the heat-sealing and electrically insulating material filling at least partly the cells of the honeycomb while interconnecting the two layers or leafs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES75015 PARIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Damlencourt, Jean-Francois Laval, FR 16 238
Moreau, Gilles Grenoble, FR 14 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00