Rotatable handle attachable to an object having a longitudinal extent

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9993064
SERIAL NO

15727740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A handle assembly attachable to an object includes an auxiliary handle and a hook with a pivot arm pivotably attached thereto to define a passageway for the object. The pivot arm is pivotable between a first position, allowing access to the passageway, and a plurality of second positions, adjusting the size of the passageway to secure the object therein. A pawl, attached to the pivot arm, is movable between a first position, engageable with a ratchet of the hook, and a second position, disengaged therefrom. A shank extends the hook, and a clutch operatively couples the shank to the auxiliary handle. The clutch is actuatable between an engaged position and a disengaged position. The shank is moveable relative to the auxiliary handle in translation when the clutch is in the engaged position and the shank is rotatable relative to the auxiliary handle when the clutch is in the disengaged position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Day, Nathaniel R Gilbert, US 5 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00