Method for controlling a mineral material processing plant and a mineral material processing plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9993827
SERIAL NO

14431493

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mineral material processing plant and a method for controlling thereof. The mineral material processing plant includes at least one motor, at least one actuator, a feeder device, a control system, and an arrangement for recognizing a need to switch off a standby-mode. The control system is configured to control the processing plant in such a way that the need to switch off a standby mode is automatically recognized. In response to the recognized need to switch off the standby mode the running speed of a motor or motors of the mineral material processing plant is raised from a stand-by speed (Rsb) to a process speed (Rf); and the feeding of mineral material into the processing plant is enabled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • METSO MINERALS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konttila, Juha Tampere, FI 1 1
Kujala, Toni Tampere, FI 2 4
Nieminen, Paavo Kangasala, FI 1 1
Permi, Sami Vesilahti, FI 3 6
Rantanen, Jukka-Pekka Tampere, FI 2 2
Tirranen, Juho Tampere, FI 2 3
Yla-Outinen, Kai Pirkkala, FI 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00