Particulate film laminating system and particulate film laminating method using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9993841
SERIAL NO

14383042

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A particulate film laminating system includes: a nanoparticle generating chamber in which nanoparticles of a metal material are generated; a nanofiber generating chamber in which nanofibers of a resin material are generated; a laminating chamber in which the nanoparticles and the nanofibers are film-formed and laminated on a substrate; a nanoparticle film-forming region configured such that the nanoparticles are film-formed in the laminating chamber; a nanofiber film-forming region configured such that the nanofibers are film-formed in the laminating chamber; a moving unit which moves the substrate between the nanoparticle film-forming region and the nanofiber film-forming region; an exhaust unit which exhausts the laminating chamber; and a coolant-gas introduction unit which introduces coolant gas into each of the nanoparticle generating chamber and the nanofiber generating chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA ATSUMITECSHIZUOKA 433-8118

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanai, Tomomi Shizuoka, JP 12 18
Uchiyama, Naoki Shizuoka, JP 149 12536

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00