Power supply system applied to electrically powered vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9994109
SERIAL NO

14955317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A boost converter is configured of a boost chopper having a diode of an upper arm and a switching element of a lower arm. Output power from a battery to a load is limited such that a current flowing through boost converter does not exceed a current upper limit value for thermal protection of boost converter. The current upper limit value is set based not only on a cooling water temperature of boost converter but also on an output voltage VH of boost converter, in consideration of characteristics that, as output voltage VH rises, an amount of heat generated in diode decreases, diode being regarded as a main target of thermal protection since it receives a power running current to load. Thereby, the boost converter can be protected from overheating without excessively deteriorating vehicle traveling performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATIONKARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Taguchi, Etsushi Kasugai, JP 7 54
Takahashi, Akihiro Kariya, JP 79 878

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00