Shift control system for automatic transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9994224
SERIAL NO

15337284

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shift control system that reduces drop in driving force and shocks during execution of clutch-to-clutch upshifting is provided. The control system is configured to reduce a torque transmitting capacity of a first clutch at a predetermined rate while increasing a torque transmitting capacity of a second clutch with a reduction in the torque transmitting capacity of the first clutch during execution of the upshifting, to set a target speed of the engine to a level determined by adding a predetermined speed to a synchronous engine speed corresponding to a low speed stage, during a torque phase in which the torque transmitting capacity of the first clutch is being reduced and the torque transmitting capacity of the second clutch is being increased, and to execute a feedback control of an engine torque in such a manner as to maintain the engine speed to the target speed based on a difference between the target speed and an actual engine speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • C/O TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kumagai, Kuninori Susono, JP 4 2
Mizuno, Junya Suntou-gun, JP 10 27
Moriya, Naoto Toyota, JP 14 57
Watanabe, Hideo Toyota, JP 451 5757

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00