Modified fiber, methods, and systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995000
SERIAL NO

15253450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of forming crosslinked cellulose include mixing a crosslinking agent with an aqueous mixture of cellulose fibers containing little to no excess water (e.g., solids content of 25-55%), drying the resulting mixture to 85-100% solids, then curing the dried mixture to crosslink the cellulose fibers. Systems include a mixing unit to form, from an aqueous mixture of unbonded cellulose fibers having a solids content of about 25-55% and a crosslinking agent, a substantially homogenous mixture of non-crosslinked, unbonded cellulose fibers and crosslinking agent; a drying unit to dry the substantially homogenous mixture to a consistency of 85-100%; and a curing unit and to cure the crosslinking agent to form dried and cured crosslinked cellulose fibers. Intrafiber crosslinked cellulose pulp fibers produced by such methods and/or systems have a chemical on pulp level of about 2-14% and an AFAQ capacity of at least 12.0 g/g.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL PAPER COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miller, Charles E Federal Way, US 117 2802

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00