Control system of hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995018
SERIAL NO

15102548

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system of a hybrid construction machine includes a regeneration passage switching valve having a normal position where flow of working fluid is blocked, and a regeneration position allowing for the working fluid to flow from main passages to a regeneration motor when a working fluid pressure of the main passages reaches a set pressure during operation of the actuators, and an assist switching valve having a normal position proportionally dividing the working fluid of an assist passage into a regeneration passages, a first switching position supplying more working fluid of the assist passage to one of the main passages when that the one has a higher working fluid pressure, and a second switching position supplying more working fluid of the assist passage to the other one of the main passages when that the other one has a higher working fluid pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYB CORPORATION4-1 HAMAMATSU-CHO 2-CHOME MINATO-KU TOKYO 1055128 ?1055128

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egawa, Masahiro Saitama, JP 37 176
Kawasaki, Haruhiko Kanagawa, JP 40 238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00