Offset current implementation for battery charger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997947
APP PUB NO 20160322836A1
SERIAL NO

15204730

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transport refrigeration unit (TRU) battery charging system includes a programmable transport refrigeration system (TRS) Controller, a TRU battery and a programmable battery charger (BC) programmed to transfer electrical current to the TRU battery via a predetermined current path through the programmable TRS Controller in response to a value of offset current drawn from the TRU battery by the programmable TRS Controller and subsequently communicated to the programmable BC by the programmable TRS Controller. The programmable TRU battery charger allows for a dynamic load characterization of the programmable IRS Controller and accessory loads based on programmable TRU battery charger internal shunt current measurements and programmable TRS Controller internal shunt current measurements to allow the programmable TRU battery charger to function properly with all intended modes of operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THERMO KING CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muralidhar, Ashok Eagan, US 17 117
Nelson, Matt Cottage Grove, US 19 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00