Conversion apparatus, equipment, and control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997990
SERIAL NO

15718810

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The conversion apparatus includes a conversion module having a plurality of phases, each having a converter capable of performing voltage conversion of discharging electric power of a power source and a sensor detecting phase current flowing in the converter, and in which the phases are electrically connected in parallel, and a controller which controls each converter with a control signal based on a predetermined duty ratio. The controller includes a first determination unit which determines a basic duty ratio common to all of the plurality of phases, a second determination unit which determines a correction duty ratio for correcting the basic duty ratio at each of the converters, and a generation unit which generates a control signal based on the basic duty ratio and the correction duty ratio. The second determination unit determines the correction duty ratio, and sets an upper or lower limit value of the correction duty ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTD1-1 MINAMI-AOYAMA 2-CHOME MINATO-KU TOKYO 107-8556

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Komatsu, Masaaki Saitama, JP 57 280

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00