Boost converter with flying capacitor and refrigeration circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9998007
SERIAL NO

15320503

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion device is provided that includes a rectifier, a booster circuit configured to boost an output voltage of the rectifier, a smoothing capacitor configured to smooth an output voltage of the booster circuit, and an inverter circuit configured to convert a DC voltage of the smoothing capacitor to an AC voltage and drive a motor forming a part of a device supplied with the voltage after the conversion. In addition, a reactor, a first backflow prevention element, a second backflow prevention element, a first switching element, a second switching element, an intermediate capacitor, and a controller configured to control the first switching element and the second switching element, are included.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONCHIYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwata, Akihiko Tokyo, JP 99 1890
Kusube, Shinsaku Tokyo, JP 42 411
Tsumura, Akihiro Tokyo, JP 31 187
Yuasa, Kenta Tokyo, JP 32 251

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00