Method and apparatus for efficient switching in semi-resonant power converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9998020
APP PUB NO 20170317595A1
SERIAL NO

15143068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A voltage converter includes a power stage, a passive circuit, a synchronous rectification (SR) switch component, and a control circuit. The passive circuit couples the power stage to an output node of the voltage converter, and is switchably coupled to ground by the SR switch component. The SR switch component includes a plurality of SR switches, which are independently controllable. The control circuit determines which of the SR switches are to be activated/enabled, and only uses those SR switches in its variable switching of the voltage converter. The determination of which SR switches are to be activated/enabled is based upon an estimate of the output current for the voltage converter. By using more SR switches when the voltage converter is fully loaded, and fewer SR switches when it is lightly loaded, the power loss of the SR switch component is minimized and the voltage converter is more power efficient.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INFINEON TECHNOLOGIES AUSTRIA AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Babazadeh, Amir Laguna Hills, US 52 496
Carroll, Robert Andover, US 25 980

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00