Method of manufacturing a circuit device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9998032
SERIAL NO

15702228

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one form, a method of manufacturing a circuit device comprises providing a lead frame comprising a plurality of leads, each comprising an island portion, a bonding portion elevated from the island portion, a slope portion extending obliquely so as to connect the island portion and the bonding portion, and a lead portion extending from the bonding portion. First and second transistors and first and second diodes are mounted upper surfaces of island portions of respective first and second leads, and are connected to the respective leads through wirings that connect the transistors and diodes to the bonding portions of the respective leads. Lower surfaces of the island portions are attached to an upper surface of a circuit board, and the circuit board, the transistors, the diodes, and the lead frame are encapsulated by a resin, so that the lead portions are not covered by the resin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR COMPONENTS INDUSTRIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horiuchi, Fumio Ashikaga, JP 6 45
Inagaki, Yuhki Kumagaya, JP 5 28
Kudo, Kiyoaki Gunma, JP 6 34
Mashimo, Shigeaki Maebashi, JP 19 403
Sakurai, Akira Tatebayashi, JP 85 1050

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00