Power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9998057
APP PUB NO 20170288593A1
SERIAL NO

15470022

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A converter includes one chip constituted a switching device and a diode. An electronic control unit is configured to calculate a temperature estimated value of the switching device from control conditions of the converter, restrict a control upper-limit value of charge power or discharge power of a battery, when a detection value of a temperature sensor is higher than the temperature estimated value of the switching device, and the detection value of the temperature sensor exceeds a protection temperature of the diode, and restrict a control upper-limit value of charge power or discharge power of the battery, when the detection value of the temperature sensor is lower than the temperature estimated value of the switching device, and the detection value of the temperature sensor exceeds a protection temperature of the switching device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATIONKARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oba, Tomoko Nagoya, JP 22 87
Suzuki, Kota Toyota, JP 48 580

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00