Printed circuit board and optical module comprising solder resist having no contact with an electro-conductive contact sheet group on a same substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9999130
APP PUB NO 20170181283A1
SERIAL NO

15258330

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The application provides a printed circuit board and an optical module so as to alleviate poor contact between the electro-conductive contact sheet group and the clamping piece due to the solder resist. The printed circuit board includes a substrate, and electro-conductive wirings and electro-conductive contact sheet group both laid on the surface of the substrate, where the substrate is overlaid with solder resist, and the solder resist has no contact with the electro-conductive contact sheet group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HISENSE USA CORPORATION7310 MCGINNIS FERRY ROAD SUWANEE GA 30024
HISENSE INTERNATIONAL CO LTDNO 218 QIANWANGANG ROAD ECONOMIC AND TECHNICAL DEVELOPMENT ZONE QINGDAO SHANDONG 266555

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Wei Qingdao, CN 121 560
Yu, Lin Qingdao, CN 87 856
Zhao, Wei Qingdao, CN 814 5746

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00