Column-beam connecting assembly capable of being manually assembled and frame structure assembled thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9999303
APP PUB NO 20170303687A1
SERIAL NO

15516030

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention discloses a column-beam connecting assembly capable of being manually assembled, including connecting columns and connecting beams. The connecting column is formed with an arc channel along the axial direction. The arc channel opens to the surface of the column as a groove. A number of pairs of anchor slots are shaped on both sides of the groove, and the anchor slots of the same pair are at the same height. Mounting parts for snapping into the anchor slots are shaped on both sides of the connecting beam. Half T-shaped jointing heads are provided on the outer ends of said mounting pans for connecting to the arc channel, and said jointing heads are either in the shape of a column head matching the arc channel, or in the shape of a hook head. A frame structure assembled by the connecting parts is further disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tan, Jianmin Foshan, CN 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00