High-speed polymer-to-metal direct joining system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11396139
APP PUB NO 20200368976A1
SERIAL NO

16856534

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of directly joining a polymer to a metal along a joint interface through the formation of C—O-M chemical bonds, where M represents an element in the metal to be joined. The method includes heating the metal to a predetermined temperature above a glass transition temperature of the polymer and less than a flash ignition temperature of the polymer and less than a metal melting temperature of the metal; physically contacting at least one of the metal and the polymer; and applying compression pressure to the joint interface of the metal and the polymer when the metal is above the glass transition temperature of the polymer and less than the flash ignition temperature of the polymer and less than the metal melting temperature of the metal to generate intimate atomic contact between the metal and the polymer to create C—O-M chemical bonds between the metal and the polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE REGENTS OF THE UNIVERSITY OF MICHIGAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dong, Pingsha Ann Arbor, US 18 139
Liu, Fengchao Ann Arbor, US 8 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00