Accelerated formation of intercalation compounds within capacitor or battery cell negative electrode

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11367861
APP PUB NO 20210320289A1
SERIAL NO

16843547

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method for the formation of lithium, potassium, and/or calcium intercalation compounds on a negative electrode for a battery or capacitor cell is disclosed. The battery or capacitor cell is constructed with a negative electrode that may contain graphitic carbon, silicon, metal oxide, and/or complex metal oxides and a lithium, potassium, and/or calcium ion source supplemental electrode. After construction of the cell, a method of controlled electrical contact is applied between the positive electrode and negative electrode to accelerate and regulate a process of ion exchange between the supplemental metal ion source electrode and the negative electrode which results in the formation of intercalation compounds within the negative electrode, and produces a battery or capacitor with a higher working voltage, high cycle life, and long DC life.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LICAP TECHNOLOGIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hart, Jonathan Sacramento, US 48 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00