Asymmetric integral lifting construction method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8745956
APP PUB NO 20140017059A1
SERIAL NO

13939749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for lifting an asymmetric integral construction is provided, including the steps of determining proper lifting points on a construction to be lifted according to the position relationship between the construction and a base supporter, setting a dragging point on the bottom of the construction, the dragging point being located on the extension line of the connection between the gravity center of construction and the centroid of the lifting points, determining a projection point of the dragging point on the ground, arranging a dragging device between the dragging point and the projection point, installing a lifting system at a proper position, conducting lifting operation by means of the lifting system cooperated with the dragging device, and rectifying and fixing the construction after it is in place.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD.;SHANGHAI YESHENG MECHANICAL & ELECTRICAL CONTROL TECHNOLOGY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Zhenying Guangzhou, CN 4 4
Gao, Junyue Guangzhou, CN 7 11
Wang, Long Guangzhou, CN 254 1140
Wei, Wei Shanghai, CN 494 2817

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00