Battery manufacturing apparatus and battery manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11355795
APP PUB NO 20200106142A1
SERIAL NO

16504507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery manufacturing apparatus includes a binding member for bounding a battery stack and a fluid supplying part for blowing cooling fluid onto the bound battery stack. The binding member includes a first both-side part for bounding batteries from both sides by applying a load thereon in a first direction in which the batteries are arranged, and a second both-side part to be placed on both sides of the batteries to face both side surfaces of the batteries in a second direction different from the first direction. The binding member is formed with apertures through which the cooling fluid flows outward in the second direction. The fluid supplying part includes a first discharging part and a second discharging part for discharging the cooling fluid from both sides in a third direction different from both the first direction and the second direction toward the battery stack bound by the binding member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 501 TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ide, Naotaka Nagakute, JP 4 6
Kobayashi, Kiwamu Anjo, JP 64 1532

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00