Methods and systems for making metal-containing particles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11185920
APP PUB NO 20190217392A1
SERIAL NO

16230093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one or more embodiments presently described, metal-containing particles may be made by a method that includes introducing a molten material into a reaction zone of a reactor system, passing a process gas into the reaction zone in a direction substantially tangential to a sidewall of the reaction zone, and contacting the process gas with the molten material in the reaction zone to form metal-containing particles. The molten material may be introduced into an upper portion of the reaction zone The reaction zone may include a substantially circular cross-section, and the molten metal may be introduced into the reaction zone in a laminar flow or as atomized particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HAMMOND GROUP, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kowalski, Philip Michael Wanatah, US 4 0
Murphy, Terrence Hyde Chicago, US 4 0
Wilke,, IV William Peter Saint John, US 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 30, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 30, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 30, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00