Fireproof material and fireproof plate, and fireproof wall structure for tunnel and construction method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11440845
SERIAL NO

16581713

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a fireproof material, a fireproof plate, a fireproof wall structure for tunnels and a construction method. The fireproof material includes the following components in weight ratio: 20-35 parts of aluminosilicate; 10-25 parts of calcium carbonate; 5-15 parts of magnesium oxide; 5-15 parts of silica; 20-40 parts of a binder; and 5-10 parts of a curing agent, the binder includes at least one of lithium silicate, potassium silicate and sodium silicate in combination with at least one of quartz sand and industrial sugar; and the curing agent is at least one of lithium oxide and magnesium oxide. In the preparation, firstly forming the mixture of aluminosilicate, magnesium oxide and silica into particles at 900° C.-1250° C., and then mixing the particles with calcium carbonate, the binder and the curing agent, and then pouring same into a forming mold and heating and pressing to form the fireproof material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LUYU ROYAL GOLD BUILDING MATERIALS (HEYUAN) CO., LTD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhou, Guofu Guangdong, CN 150 1998

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00