Electronic device and method for manufacturing electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11837563
APP PUB NO 20230020588A1
SERIAL NO

17956768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an electronic device includes: providing a substrate; forming a plurality of connecting pads and a plurality of conductive portions partially overlapped by the plurality of connecting pads on the substrate; forming a plurality of conductive lines on the substrate, wherein one of the plurality of conductive lines is partially overlapped with one of the plurality of conductive portions, and an insulating layer is disposed between one of the plurality of connecting pads and the one of the plurality of conductive portions; and bonding a plurality of light emitting units to the plurality of connecting pads.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNOLUX CORPORATIONMIAO-LI COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jia-Yuan Miao-Li County, TW 93 150
Tsai, Tsung-Han Miao-Li County, TW 649 5171

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00