Composite structure having a variable gage and methods for forming a composite structure having a variable gage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10919256
APP PUB NO 20200353712A1
SERIAL NO

16408410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an example, a composite structure having a variable gage is described. The composite structure includes a first end having a first gage, a second end having a second gage, which is less than the first gage, a plurality of continuous plies, and a plurality of drop-off plies. Each continuous ply extends from the first end to the second end. Each drop-off ply includes a tip having a tapered shape. Each drop-off ply extends from the first end to a respective position of the tip of the drop-off ply between the first end and the second end. The tips of the plurality of drop-off plies are arranged in a monotonically-inward pattern.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Jiangtian Seattle, US 23 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 16, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00