Determining mineralogy of an earth formation using linear regressions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874551
APP PUB NO 20150260034A1
SERIAL NO

14211751

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for determining mineralogy of a formation includes determining a model of arenites in the formation by performing a first type of linear regression on a plurality of elemental dry weights of the formation based upon a sum of elemental dry weights of calcium and magnesium being at least a given value, or performing a second type of linear regression on the elemental dry weights based upon the sum of the elemental dry weights of elemental calcium and magnesium being less than the given value. A model of arkoses in the formation is determined by performing a third type of linear regression on the elemental dry weights. A partitioning function is then determined. The mineralogy of the formation is then determined by applying the partitioning function to the model of arenites and the model of arkoses, and adding the model of arenites and the model of arkoses together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SCHLUMBERGER TECHNOLOGY CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herron, Michael Cambridge, US 9 35
Herron, Susan Cambridge, US 6 73
May, Dale Bellville, US 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00