Beneficiation of coal for storage, transportation, and gasification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11421169
APP PUB NO 20200157447A1
SERIAL NO

16684875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This document describes methods for pretreating coal to create either a dried coal or a char product that is stable in the outdoor environment and is more efficient as a feedstock for gasification or other processes than the original coal. Embodiments of the methods include pulverizing and pelletizing the coal, and pretreating the coal pellets to obtain a stable pellet of either dried coal or a stable pellet of chared coal (coal char). The pellets created by the described methods have undergone deoxygenation and carbonization improving their handling and storage properties and, in some cases, energy density. Pore structures within the pellets are stabilized physically and chemically so that the uptake of moisture into dry coal, that leads to internal heat generation, is greatly reduced. Chars are also, therefore, stable against transitions from a dry state to a wet state and less prone to self-ignition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TERRAPOWER, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goodrich, Benjamin L Marysville, US 6 15
Kim, Pyoungchung Bothell, US 6 3
Terrell, Evan Pullman, US 1 0
Walter, Joshua C Kirkland, US 77 306

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00