Cross point array architecture for multiple decks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11895851
APP PUB NO 20230114077A1
SERIAL NO

17499707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and devices for cross point array architecture for multiple decks are described. A memory array may include multiple decks, such as six or eight decks. The memory array may also include sockets for coupling access lines with associated decoders. The sockets may be included in sub-blocks of the array. A sub-block may be configured to include sockets for multiple access lines. A socket may intersect an access line in the middle of the access line, or at an end of the access line. Sub-blocks containing sockets for an access line may be separated by a period based on the access line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICRON TECHNOLOGY INC8000 SOUTH FEDERAL WAY BOISE ID 83716-9632

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fratin, Lorenzo Buccinasco, IT 72 423
Pirovano, Agostino Milan, IT 143 1172

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00