Multilayer board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8963017
APP PUB NO 20130048345A1
SERIAL NO

13595060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a multilayer board, a stacked body includes thermoplastic resin films and low-fluidity resin films with conductive patterns, which are alternately stacked. The stacked body and a resin base film are integrated by hot pressing. The base film has a terminal-connecting through hole for receiving an electrode terminal of an electronic component to be connected to a conductive pattern of the low-fluidity resin film disposed at an end of the stacked body. An electronic component mounting section of the stacked body, which is an area corresponding to the electronic component mounted on the base film in a stacking direction, is configured such that a number of the conductive patterns located in a corresponding section that corresponds to the through hole in the stacking direction is greater than a number of the conductive patterns located in a non-corresponding section without corresponding to the through hole in the stacking direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DENSO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kajino, Hidetada Nagoya, JP 3 23
Kondoh, Kenji Anjo, JP 3 31
Kondoh, Kouji Toyohashi, JP 16 123
Masuda, Gentaro Obu, JP 6 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00