Solid-state battery and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11942604
APP PUB NO 20200303780A1
SERIAL NO

16898474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid-state battery having a battery body that includes a plurality of adjacent elements. A first external electrode is electrically connected to a first positive electrode. A second external electrode is electrically connected to a first negative electrode. A third external electrode is electrically connected to a second positive electrode. A fourth external electrode is electrically connected to a second negative electrode. A first element and a second element of the plurality of adjacent elements are connected in series by integrating the first external electrode and the fourth external electrode or by integrating the second external electrode and the third external electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baba, Akira Nagaokakyo, JP 76 853

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00