Draper platform with reconfigurable central roller baffle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10477770
APP PUB NO 20190029181A1
SERIAL NO

15663696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A draper platform for mounting on a feeder house of an agricultural combine may include a frame, a center belt conveyor to carry cut crop material rearwardly towards a center opening in the frame through which crop may be fed into a feeder house, a left side belt conveyor to carry cut crop material to the center belt conveyor, a right side belt conveyor to carry cut crop material to the center belt conveyor, at least one elongate reciprocating knife assembly extending along a front edge of each of the center belt conveyor, the left side belt conveyor and the right side belt conveyor, a conveyor drum above the center belt conveyor and a central roller baffle. The central roller baffle may include a rotatable support rotatably supported above the conveyor drum and a crop driver removably mounted to the rotatable support.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DEERE & COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bomleny, Duane M Geneseo, US 55 268
Hoffman, Daniel S Bettendorf, US 18 90
Modak, Shreyas P Thane, IN 8 18
Yanke, Bryan R Eldridge, US 27 114

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00