Rescheduling of virtual machine migrations with less impact on an existing migration schedule

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11256541
SERIAL NO

16773249

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus, for an existing schedule indicating time slots during which virtual-machines are to be migrated between physical-machines, acquires change information indicating a change of first time slots during which first virtual-machines are to be migrated, and generates constraint information including a group of constraints regarding the change information and second time slots during which second virtual-machines other than the first virtual-machines are to be migrated. The apparatus generates semi-constraint information items each generated by excluding, from the constraint information, an exclusion target constraint that is selected in turn from among the group of constraints, and generates, for each semi-constraint information item, a rescheduling result by rescheduling migrations of the virtual-machines. The apparatus outputs a first rescheduling result that is one of the generated rescheduling results which reduces a difference between a scheduled migration time indicated by the first rescheduling result and scheduled migration times of the second virtual-machines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJITSU LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iikura, Fumi Shinagawa, JP 22 182
Okuno, Shingo Kawasaki, JP 41 54
Watanabe, Yukihiro Kawasaki, JP 110 674

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 22, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 22, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 22, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00