Modular data center having an air cooled external equipment panel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11277943
APP PUB NO 20210153389A1
SERIAL NO

16685866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular data center (MDC) has an air handling system that air cools a volumetric container and heat-generating equipment contained in externally attached equipment panels. Heat-generating information technology (IT) component(s) are positioned within the volumetric container with a cold aisle defined on one side and a hot aisle defined on another side of the IT component(s). The IT component(s) has air-cooling air passages that fluidly communicate between the cold and the hot aisles. A cooling unit pressurizes the cold aisle with supply air and draws return air from the hot aisle. The equipment panel(s) are externally attached to an exterior wall of the volumetric container. A supply air conduit directs supply air from the cold aisle into the equipment panel(s). A return air conduit directs air warmed by the heat-generating equipment inside the equipment panel into the hot aisle from the equipment panel(s) that receives the supply air.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DELL PRODUCTS, L.P.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey, Mark M Round Rock, US 51 320
Davis, James S Round Rock, US 12 903
Duncan, Tyler B Austin, US 22 83
Wiederhold, Trey S Cedar Park, US 20 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00