Radioactive granular dispensing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11393605
APP PUB NO 20180374595A1
SERIAL NO

15863116

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is disclosed a system for dispensing granular material, comprising: a nozzle attached to a granular filler configured to couple with a trefoil filling port attached to a can for hot isostatic pressing, wherein the nozzle opens and closes via a rotary actuation. In an embodiment, the system comprises a single fill port design, such as one having a concentric, tube-in-tube design. There is also disclosed a method of filling a container with a granular material, by connecting a filling nozzle to a filling port, opening/closing the filling nozzle, attaching the filling nozzle to the filling port, aligning at least one opening of the filling nozzle with an opening in the filling port; and dispensing granular material into the container.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GEOROC INTERNATIONAL, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chung, Simon New South Wales, AU 8 182
Moricca, Salvatore New South Wales, AU 14 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00