AC overbuild add-on

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862980
SERIAL NO

17812392

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An add-on renewable power plant (ARPP) may include a renewable energy source (RES) connected to a legacy renewable power plant (LRPP) interconnection infrastructure, where an output capacity of the RES is sized based on an LRPP transmission capacity and an LRPP power output profile, and an energy storage system (ESS) connected to the LRPP interconnection infrastructure, where a storage capacity of the ESS is sized based on the LRPP transmission capacity and the LRPP power output profile. The ARPP may also include a controller configured to control an ARPP output by controlling an RES output and an ESS charge/discharge such that a variability of an ARPP-LRPP combined power output has a lower variability than a variability of an LRPP output and control the ARPP output such that the ARPP-LRPP combined power output does not exceed a transmission capacity of the LRPP interconnection infrastructure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
8ME NOVA LLCEL DORADO HILLS CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buttgenbach, Thomas Santa Monica, US 26 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00