Electric motor assembly for reducing air flow loss

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11770043
SERIAL NO

17337034

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor assembly includes an impeller, a guide vane disposed at a one side of the impeller along an axial direction, a stator disposed at one side of the guide vane along the axial direction, a rotor configured to rotate relative to the stator to thereby rotate the impeller, and a frame disposed at an outside of the stator in a radial direction and coupled to the stator. The frame includes a body that has a cylindrical shape, that is disposed at the outside of the stator, and that defines an air flow path, and a plurality of stator fixing parts that protrude from an inner surface of the body and are coupled to the stator. The plurality of stator fixing parts are inclined with respect to the axial direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INC128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lim, Jinsub Seoul, KR 5 8
Noh, Jaegeun Seoul, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00