Display substrate, method for manufacturing display substrate, and display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11810924
APP PUB NO 20230135580A1
SERIAL NO

17433217

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display substrate, a method for manufacturing the display substrate and a display device are provided. The display substrate includes an Electric Test (ET) region. At least one testing pad and an insulation structure surrounding the testing pad are arranged in the ET region, and a distance between a surface of the insulation structure distal to a base substrate of the display substrate and the base substrate is not greater than a distance between a surface of the testing pad distal to the base substrate and the base substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHENGDU BOE OPTOELECTRONICS TECHNOLOGY CO., LTD.; BOE TECHNOLOGY GROUP CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Cong Beijing, CN 152 671
Meng, Huijie Beijing, CN 3 0
Song, Erlong Beijing, CN 11 1
Wei, Feng Beijing, CN 56 44
Zhou, Hongjun Beijing, CN 74 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00