Coated cutting tool and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11511352
APP PUB NO 20210162510A1
SERIAL NO

17048666

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a coated cutting tool having a base material side single layer portion and a laminated portion provided as a hard coating in order from a base material side. The base material side single layer portion is formed of a nitride-based hard coating in which a proportion of Al is highest among metal (including metalloid) elements, a sum of Al and Cr in a content ratio (atomic ratio) is 0.9 or more, and at least B is contained. In the laminated portion, a nitride-based a layer in which a proportion of Ti is highest among metal (including metalloid) elements and at least B is contained, and a nitride-based b layer in which a proportion of Al is highest among metal (including metalloid) elements and at least Cr and B are contained are alternately laminated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MOLDINO TOOL ENGINEERING, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fuwa, Ryoutarou Narita, JP 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 29, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00