Process for preparing a diene copolymer comprising a polyether block, diene copolymer comprising a polyether block, reinforced rubber composition and tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8455584
APP PUB NO 20100252156A1
SERIAL NO

12666946

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing, in one step, a diene block copolymer, of which at least one of these blocks is constituted of a polyether, the number-average molecular weight of which is approximately from 100 to 5000 g/mol, and at least one other of these blocks is constituted of a diene elastomer. The process according to the invention allows a high degree of grafting of the polyether to the polymer chains. Also disclosed is a reinforced rubber composition, especially intended for the manufacture of tires, comprising such a block copolymer which is intended to interact with the reinforcing filler. Such a rubber composition has improved hysteresis properties in the vulcanized state, while retaining satisfactory processing properties in the non-vulcanized state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COMPAGNIE GENERALE DES ETABLISSEMENTS MICHELIN;MICHELIN RECHERCHE ET TECHNIQUE S.A.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barbotin, Fanny Grenoble, FR 14 208
Chaboche, Philippe Clermont-Ferrand, FR 4 255
Favrot, Jean-Michel Cournon D-Auvergne, FR 34 741
Robert, Pierre Clermont-Ferrand, FR 29 851

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00