Display system, display method, and display program for displaying image on head-mounted display

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11327705
APP PUB NO 20210132889A1
SERIAL NO

17080806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The display system includes a host apparatus and an HMD. The host apparatus includes an image display unit configured to display, an image transmitted from the host apparatus, in which the image processing unit is configured, when detecting that the host apparatus is connected with the HMD, to associate first sensor data from the first inertial sensor with second sensor data received from the second inertial sensor, to recognize a target in the image captured by the camera, to use the second sensor data to perform image processing, and to cause the image display unit to display the image after the image processing in association with the target, when detecting that the host apparatus is not connected with the HMD, to use the first sensor data to maintain an estimation of a state of the target in the outside scene until the host apparatus is reconnected with the HMD.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Shinya Matsumoto, JP 169 1119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00