Storage tank containment system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11493173
APP PUB NO 20210095819A1
SERIAL NO

17118079

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tank is used in the containment, transport, and/or storage of fluids, e.g., one or more liquids and/or gases. In one embodiment, the tank includes a plurality of segments collectively defining an interior chamber that retains the fluid(s), each of which includes opposing ends defining beveled mating surfaces. The tank also includes a plurality of endcaps positioned between, and in engagement with, adjacent segments, as well as a plurality of webs that include a series of first webs having a first configuration and a series of second webs having a second, different configuration. The first webs are positioned within the plurality of segments between the ends thereof, and the second webs are positioned within the endcaps. In an alternate embodiment, the tank is devoid of the endcaps, and instead, includes segments defining beveled mating surfaces that intersect at junctures to define four corner sections of the tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ALTAIR ENGINEERING, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lamb, Thomas Lynnwood, US 22 160
Ramoo, Regu Ashburn, US 14 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00